RMI REQUIRES PHOTOS OF GENERAL INSTALLATION FOR EACH WORK DAY(START, FINISH AND DETAIL AREAS (EQUIPMENT, FLASHING, PENETRATIONS, FIELD,EDGES, COPING, DRAINS, ETC). DOCUMENTATION REQUIRED FOR THE INITIAL 500 SQ.FT AND EACH ADDITIONAL 2000 SQ. FT. OF ROOF SURFACE: NOTE PHO ID OF EITHER MIL THICKNESS TEST INNOTES ABOVE OR PHOTO/DOCUMENTATION OF EQUIPMENT SETTING SHOWING PRODUCTVOLUMES. LET PHOTOS REPRESENT THE PROJECT AS YOU WOULD WANT TO SEE ITFOR REVIEW. PLEASE MAKE PHOTO RESOLUTION AT SMALL OR 640X480.
The above referenced information is true and accurate for our work on the aforementioned project. Signature of this form indicates acknowledgment of requirements set forth in the project documents including prequalification approvals. The undersigned is an authorized representative of the Contractor and shall be considered binding as the “Contractor” itself per project information on within this form.